STEAMER

Karlville continues to lead global innovation with the introduction of our 2 Meter STEAMER. The Steamer 2M can handle up to 200 bottles per minute. The Steamer design, with an integrated boiler allows companies to save money and time, because they do not need to install stand alone steam boiler on site.

The internal design of the tunnel, along with the dual blower exhaust system allows for high temperature generation with consistent internal pressure and low power consumption.

TECHNICAL SPECIFICATIONS
  • Available Lenghts: 1000 mm
  • Max Sleeve Cut Height: 300 mm
  • Max Container Height: 350 mm
  • Max Container Diameter: 130 mm
  • Speed: Up to 150/250 containers per minute

 

ADVANTAGES
  • No need to build separate boiler rooms to house boilers
  • No need to hire engineers to design and permit boiler rooms
  • No Need for costly overhead insulated steam pipe infrastructure
  • Ideal to integrate to mid speed range applicators such as our SleevePro 150
  • Excellent quality, performance and low utility requirement
  • Plug & Play
  • Fully adjustable pipes for excellent steam distribution
  • Quick changeover